MWITA-SC-2026-059 · Evidence A · P1
Brazil's EPE reported that data-centre projects requesting grid-connection studies rose from 19.8 GW in September 2025 to 26.2 GW in November 2025.
What this does not establish
Requested connection capacity is neither awarded connection capacity nor built, energized or consumed load.
Counterevidence & uncertainty
The cited official or first-party record can be revised and may not be independently audited. Requested connection capacity is neither awarded connection capacity nor built, energized or consumed load.
What would change the reading
A newer official operational or statistical release after 2025-11 revises the figure, scope, definition, or status.