Saudi Vision 2030 National Transformation Program Annual Report 2025
Government of Saudi Arabia · 3 connected claims
Canonical route
https://www.vision2030.gov.sa/media/uxhfb5if/ntp_en_annual_report_2025.pdf
Claims connected to this source
- MWITA-WS-2026-045Saudi Arabia's 2025 National Transformation Program report states that the Shuaiba Phase 5 reverse-osmosis plant has production capacity of 670,852.4 cubic metres per day.Evidence A
- MWITA-WS-2026-046The Saudi report states that Al Khobar Phase II achieved 1.7 kWh per cubic metre for salt separation and 2.34 kWh per cubic metre overall.Evidence A
- MWITA-WS-2026-047Saudi Arabia's report distinguishes salt-separation energy from overall plant energy consumption.Evidence A