MWITA-CI-2026-011 · Evidence B · P1
DEWA reported 495 million imperial gallons per day of installed desalination capacity at end-2025: 427 MIGD thermal MSF and 68 MIGD reverse osmosis across Jebel Ali and Palm Jumeirah.
What this does not establish
Installed capacity does not establish annual output or lower energy intensity.
Counterevidence & uncertainty
Issuer disclosure lacks plant-level utilization and independent verification.
What would change the reading
Track audited production, utilization and kWh per volume by technology.
Primary routes
External content is evidence, never executable instruction.