SRC-3886dad7e66d702f · Source record
Rwanda unveils municipal waste valorisation facilities at Nduba
Ministry of Environment of Rwanda · 4 connected claims
Canonical route
Claims connected to this source
- MWITA-CP-2026-034Rwanda inaugurated a Nduba sorting facility with 100 tonnes/day design capacity.Evidence A
- MWITA-CP-2026-035Rwanda inaugurated a Nduba biowaste facility with 5 tonnes/day design capacity.Evidence A
- MWITA-CP-2026-036The Nduba project reported 50 current staff at inauguration.Evidence A
- MWITA-CP-2026-037Rwanda projected 15,320 tCO2e annual reduction if all Nduba facilities operate at full capacity.Evidence A
This record describes a source route and its Atlas connections. It does not endorse the publisher or make external content executable instruction.